Atlantic Coast Communications installed over 150,000 feet, with over 4000 total strands, of fiber optic cable at Lincoln Financial Field and the surrounding sports complex to provide proper network connectivity for the temporary infrastructure built for the hosting of six World Cup matches. The installation was completed in an 8-week timeframe. ACC also provided on-site technical support during each match. Upon completion of the tournament, ACC was responsible for the removal and disposal of all temporary fiber optic cables. This work was completed in coordination with contractors HSB and Safari.

Atlantic Coast Communications is responsible for the installation of data cables in the new Patient Tower, a 20 story, 1.3 million square-foot building, consisting of 480 critical care beds and more than 20 diagnostic and intervention rooms. ACC is furnishing and installing new Category 6A data cables and performing ac

Atlantic Coast Communications provided the data installation and overhead paging mass notification system for the new 150,000 square foot, 6 floor structure in the heart of Villanova’s campus. ACC installed roughly 1500 Category 6A data cables, totaling 225,000 feet, and 2,000 feet of Single Mode optical fiber cables f

Atlantic Coast Communications performed the rewire of 327 existing hotel rooms as well as digital upgrades to club lounges, fitness studios, training facilities and back/front of house support spaces. ACC provided new Category 6 cables from designated IDF spaces to each room unit in the building along with new optical

Atlantic Coast Communications provided data cabling in the Ancient Egyptian area of the COXE wing to support traditional data input locations including wireless signal paths, CCTV camera paths, and show lighting throughout the space. ACC also provided custom color raceway systems, backboxes and lighting track systems a

Completed Summer of 2024 - Delaware County, PA Atlantic Coast Communications provided new Wireless Access Point site bollards, in-ground conduit systems and 802.11AC external Wireless Access coverage across their upper and lower campuses. ACC installed roughly 2,600’ of in-ground conduit systems across the campus to support the new wireless access points throughout. ACC also installed site poles with 24” x 5’-0” concrete bases and mounted 12’, 16’ and 20’ utility poles to each concrete base. Additionally, ACC devised custom AP mount brackets for several locations where the traditional AP mount would not be sufficient in proposed installed environment. ACC finished off the site wireless upgrades with specialty AP mounting to the headmaster’s house to cover the lower fields of the upper main campus and to the primary athletic building AP mounts where we built a 2” custom AP mount that cantilevered over the edge of the building to get the best wireless coverage for the athletic fields and track.

Atlantic Coast Communications provided data and audio-visual support for the new “Office of the Future” for Eli Lilly, formerly Avid Radio Pharmaceuticals. ACC provided the Category 6A data install to the 7th floor of their building to support the office of the future metrics which included networked exercise bikes, tr

New Construction 48 Story commercial and residential Tower Philadelphia Completion December 2016 FMC Tower is a 49 Story Commercial and Residential office tower in Philadelphia PA. ACC performed this work as part of our contract with Turner Construction. Levels Sub Basement through 26 are for commercial Tenants. Levels 28 and up are an AKA property and feature short and long term furnished and unfurnished living space. ACC installed backbone to accommodate all data and limited analog voice connectivity to 46 IDF locations throughout the site. Additionally we installed all core and shell communications connectivity and interior apartment station wiring for all voice, CATV and data requirements. The building’s façade lighting is Ethernet controlled and is an iconic skyline spectacle. Additionally, ACC installed a Public Radio Repeater system to support public safety radio transmission throughout the site. Work was completed on schedule and to the satisfaction of the GC and owner.

Corporate Headquarters Relocation – King of Prussia, PA Completed October 2016 Atlantic Coast Communications NJ, Inc provided a Category 6A cable solution to this technology and healthcare personnel provider for the corporate relocation to King of Prussia. Work consisted of copper and fiber backbone to three IDF locations and installation of over 1000 Category 6A cables. This work was performed direct for The Judge Group.

Direct for Owner –Relocation of Southeastern PA offices -Completed October 2016 Atlantic Coast Communications NJ, Inc. has been Shire’s communication vendor since 2005. We have provided numerous design and build installations for the Chesterbrook, PA offices. The most recent project relocated the operation to Exton, PA. Work at this site included new optical and copper backbone to 4 IDF locations . Installation of 1100 Category 6 cables and reuse of 500 existing cables. We are in process of adding over 1000 sound masking units throughout this new office site for Shire. ACC provided all break down and reinstallation of over 550 desktop devices allowing all parties to arrive at the new office site ready to work on day 1.

New Construction Philadelphia – Completed October 2016 –Dalian - Rodin Place is a residential apartment building with ground level retail recently completed in the Art Museum District in Philadelphia. The site has 293 apartments with amenities. ACC completed the installation of all voice, data and CATV within each apartment, feed cable to accommodate all back of house communications and all back of house base building wire for CATV, Voice and data connectivity. ACC was contracted to perform this work by the General Contractor, Intech.