<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>accnjinc</title>
    <link>https://www.accnjinc.com</link>
    <description />
    <atom:link href="https://www.accnjinc.com/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Children’s Hospital of Pennsylvania – New Patient Tower</title>
      <link>https://www.accnjinc.com/childrens-hospital-of-pennsylvania-new-patient-tower</link>
      <description>Atlantic Coast Communications is responsible for the installation of data cables in the new Patient Tower, a 20 story, 1.3 million square-foot building, consisting of 480 critical care beds and more than 20 diagnostic and intervention rooms. ACC is furnishing and installing new Category 6A data cables and performing ac</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%288%29.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Projected completion: 2029 - CHOP Philadelphia Campus
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications is responsible for the installation of data cables in the new Patient Tower, a 20 story, 1.3 million square-foot building, consisting of 480 critical care beds and more than 20 diagnostic and intervention rooms. ACC is furnishing and installing new Category 6A data cables and performing accompanying closet terminations and EZ Path fire-rated pathway installation throughout the site. ACC is also providing installation services for CCTV cameras, wireless access points, and overhead speakers. In tandem with our sister company, Intellicom Systems Inc., ACC is furnishing and installing clocks for each patient room and common areas. All work is being completed in coordination with Johnson Controls Inc.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%288%29.png" length="830665" type="image/png" />
      <pubDate>Thu, 10 Sep 2026 03:59:58 GMT</pubDate>
      <guid>https://www.accnjinc.com/childrens-hospital-of-pennsylvania-new-patient-tower</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%288%29.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%288%29.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>2026 FIFA World Cup Fiber Installation at Lincoln Financial Field</title>
      <link>https://www.accnjinc.com/2026-fifa-world-cup-fiber-installation-at-lincoln-financial-field</link>
      <description>Atlantic Coast Communications installed over 150,000 feet, with over 4000 total strands, of fiber optic cable at Lincoln Financial Field and the surrounding sports complex to provide proper network connectivity for the temporary infrastructure built for the hosting of six World Cup matches. The installation was complet</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%287%29.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Completed Summer of 2026 - Philadelphia Sports Complex
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications installed over 150,000 feet, with over 4000 total strands, of fiber optic cable at Lincoln Financial Field and the surrounding sports complex to provide proper network connectivity for the temporary infrastructure built for the hosting of six World Cup matches. The installation was completed in an 8-week timeframe. ACC also provided on-site technical support during each match. Upon completion of the tournament, ACC was responsible for the removal and disposal of all temporary fiber optic cables. This work was completed in coordination with contractors HSB and Safari. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%287%29.png" length="10488" type="image/png" />
      <pubDate>Mon, 31 Aug 2026 03:58:49 GMT</pubDate>
      <guid>https://www.accnjinc.com/2026-fifa-world-cup-fiber-installation-at-lincoln-financial-field</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%287%29.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%287%29.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Villanova University Maggitti Hall - New Library</title>
      <link>https://www.accnjinc.com/villanova-university-maggitti-hall-new-library</link>
      <description>Atlantic Coast Communications provided the data installation and overhead paging mass notification system for the new 150,000 square foot, 6 floor structure in the heart of Villanova’s campus. ACC installed roughly 1500 Category 6A data cables, totaling 225,000 feet, and 2,000 feet of Single Mode optical fiber cables f</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%282%29.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Completed Summer of 2026 - Villanova, PA
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications provided the data installation and overhead paging mass notification system for the new 150,000 square foot, 6 floor structure in the heart of Villanova’s campus. ACC installed roughly 1500 Category 6A data cables, totaling 225,000 feet, and 2,000 feet of Single Mode optical fiber cables for MDF to IDF uplinks throughout the 6 floors. ACC also installed the Bogen overhead paging/mass notification system consisting of 8 dedicated paging zones across the building.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%282%29.png" length="889122" type="image/png" />
      <pubDate>Mon, 31 Aug 2026 03:48:32 GMT</pubDate>
      <guid>https://www.accnjinc.com/villanova-university-maggitti-hall-new-library</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%282%29.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%282%29.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Sheraton Hotel at University City</title>
      <link>https://www.accnjinc.com/sheraton-hotel-at-university-city</link>
      <description>Atlantic Coast Communications performed the rewire of 327 existing hotel rooms as well as digital upgrades to club lounges, fitness studios, training facilities and back/front of house support spaces. ACC provided new Category 6 cables from designated IDF spaces to each room unit in the building along with new optical</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%285%29.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Completed Spring of 2026 - University City, Philadelphia
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications performed the rewire of 327 existing hotel rooms as well as digital upgrades to club lounges, fitness studios, training facilities and back/front of house support spaces. ACC provided new Category 6 cables from designated IDF spaces to each room unit in the building along with new optical risers from the MDF to each of the upper floor IDF spaces. ACC also completed the Access Control systems with a new wireless mesh locking system throughout the building, new composite cables, new power supplies and new head end equipment and wall fields. Finally, ACC re-partitioned the existing Mood Media system to expand beyond the first-floor restaurant to external promenade spaces and the 6th floor amenity/fitness suite.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%285%29.png" length="353939" type="image/png" />
      <pubDate>Sun, 31 May 2026 03:56:21 GMT</pubDate>
      <guid>https://www.accnjinc.com/sheraton-hotel-at-university-city</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%285%29.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%285%29.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Delaware County Christian School (DCCS)</title>
      <link>https://www.accnjinc.com/delaware-county-christian-school-dccs</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%283%29.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Completed Summer of 2024 - Delaware County, PA
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications provided new Wireless Access Point site bollards, in-ground conduit systems and 802.11AC external Wireless Access coverage across their upper and lower campuses. ACC installed roughly 2,600’ of in-ground conduit systems across the campus to support the new wireless access points throughout. ACC also installed site poles with 24” x 5’-0” concrete bases and mounted 12’, 16’ and 20’ utility poles to each concrete base. Additionally, ACC devised custom AP mount brackets for several locations where the traditional AP mount would not be sufficient in proposed installed environment. ACC finished off the site wireless upgrades with specialty AP mounting to the headmaster’s house to cover the lower fields of the upper main campus and to the primary athletic building AP mounts where we built a 2” custom AP mount that cantilevered over the edge of the building to get the best wireless coverage for the athletic fields and track.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%283%29.png" length="279430" type="image/png" />
      <pubDate>Sat, 31 Aug 2024 03:51:19 GMT</pubDate>
      <guid>https://www.accnjinc.com/delaware-county-christian-school-dccs</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%283%29.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%283%29.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Eli Lilly – Office of the Future</title>
      <link>https://www.accnjinc.com/eli-lilly-office-of-the-future</link>
      <description>Atlantic Coast Communications provided data and audio-visual support for the new “Office of the Future” for Eli Lilly, formerly Avid Radio Pharmaceuticals. ACC provided the Category 6A data install to the 7th floor of their building to support the office of the future metrics which included networked exercise bikes, tr</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%284%29.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Completed Winter of 2024 - Center City, Philadelphia
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications provided data and audio-visual support for the new “Office of the Future” for Eli Lilly, formerly Avid Radio Pharmaceuticals. ACC provided the Category 6A data install to the 7th floor of their building to support the office of the future metrics which included networked exercise bikes, treadmills and interactive audio-visual spaces. Additionally, ACC provided the installation for the entire audio-visual package which included the fit-out of 37 AV enabled spaces ranging in size from large presentation conference rooms with dual 86-inch flat panel displays down to solitary workspaces with small 32-inch flat panel and input points for BYOD.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%284%29.png" length="561143" type="image/png" />
      <pubDate>Thu, 29 Feb 2024 03:55:09 GMT</pubDate>
      <guid>https://www.accnjinc.com/eli-lilly-office-of-the-future</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%284%29.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%284%29.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Century Therapeutics</title>
      <link>https://www.accnjinc.com/century-therapeutics</link>
      <description>Atlantic Coast communications provides voice, data, wireless, security and optical riser cabling across multiple Century sites. Century Therapeutics is an industry leader in iPSC-derived NK and T cell therapies. Atlantic Coast provides owner specific installation services for each of the unique Century sites. Atlantic</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2827%29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Multiple sites in Greater Philadelphia Area
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast communications provides voice, data, wireless, security and optical riser cabling across multiple Century sites. Century Therapeutics is an industry leader in iPSC-derived NK and T cell therapies. Atlantic Coast provides owner specific installation services for each of the unique Century sites. Atlantic Coast assists with System Room layout, Wireless Surveys and deployments, inter and intrabuilding commercial pathway and raceway planning, iner and intra building optical and multipair risers and overall constructability services. Atlantic Coast works in tandem with the design and planning teams to assist with integration of the core Lab environments, office environments and overall IP usefulness of each space. Atlantic Coast provides front end constructability services for each Century site we install. Pre-construction planning revolves around team calls and meetings that review each IP point that will be deployed at the site, how it will connect to the network and clean room/lab space planning for required IP interconnections required at each technical lab space that provides clinical research for the firm.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Our installation teams have installed over 300,000’ of premium Category 6 twisted pair cable, 5,000’ of Single Mode optical fiber and has built/fit out major server and systems rooms at each site we have performed work at. 
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2827%29.jpg" length="6673" type="image/jpeg" />
      <pubDate>Wed, 13 Oct 2021 04:41:24 GMT</pubDate>
      <guid>https://www.accnjinc.com/century-therapeutics</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2827%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2827%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>University of Pennsylvania</title>
      <link>https://www.accnjinc.com/university-of-pennsylvania</link>
      <description>The Discovery Labs at King of Prussia is a converted Pharmaceutical Corporate Campus that now acts as a beacon for local business, Universities and Corporations seeking a pre-build Research and Development facility offering leased space from a few offices to entire buildings dedicated for a single entity</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2828%29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Discovery Labs, King of Prussia, Pa
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Schedule completion December, 2021
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The Discovery Labs at King of Prussia is a converted Pharmaceutical Corporate Campus that now acts as a beacon for local business, Universities and Corporations seeking a pre-build Research and Development facility offering leased space from a few offices to entire buildings dedicated for a single entity.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast is currently providing Telecommunications and Distributed Antenna Systems (DAS) for the building 26, 3 story Vivarium Laboratory. Atlantic Coast was tasked to re-wire the existing Vivarium lab facility to include new Category 6 cable plant to support the clinical vivarium lab space as well as the specialty reporting systems (Edstrom/Avidity) for the primate section of the Vivarium Laboratory. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast installed new Optical Risers to connect Building 26 to the Metropolitan Area Network which enables real time clinical research between this campus and the Penn Network campus buildings.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast also installed a 2 Carrier DAS system in building 26, which provides wireless signal reinforcement to the central section of building 26.
            &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2828%29.jpg" length="32753" type="image/jpeg" />
      <pubDate>Wed, 15 Sep 2021 04:44:08 GMT</pubDate>
      <guid>https://www.accnjinc.com/university-of-pennsylvania</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2828%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2828%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Hyatt Centric Hotel</title>
      <link>https://www.accnjinc.com/hyatt-centric-hotel</link>
      <description>Atlantic Coast Communications NJ INC installed 1395 Berk-Tek landmark 6 category plenum 4 pair station cables to 1100 locations for Voice, Data, Cameras and WAPs throughout the hotel. The first Hyatt Centric Hotel in the city of Philadelphia stands at 1620 Chancellor Street. The 179-foot, 13-story, 175,000-square-foot</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2830%29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           1612-34 Chancellor Street
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Philadelphia, Pennsylvania 19102
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           United States
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications NJ INC installed 1395 Berk-Tek landmark 6 category plenum 4 pair station cables to 1100 locations for Voice, Data, Cameras and WAPs throughout the hotel. The first Hyatt Centric Hotel in the city of Philadelphia stands at 1620 Chancellor Street. The 179-foot, 13-story, 175,000-square-foot building offers 332 guestrooms with a 40-suite addition at the corner of South 17th and Chancellor streets. ACC also installed a 12 Strand OM3, 24 Strand SM Fiber and a 100 pair copper feed cable from the MDF to each of the 7 IDFs. Our work was performed direct to the GC, Clemens Construction.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2830%29.jpg" length="66847" type="image/jpeg" />
      <pubDate>Thu, 24 Jun 2021 04:49:54 GMT</pubDate>
      <guid>https://www.accnjinc.com/hyatt-centric-hotel</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2830%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2830%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Grounds for Sculpture Sculture Gardens &amp; Museum</title>
      <link>https://www.accnjinc.com/grounds-for-sculpture-sculture-gardens-museum</link>
      <description>Atlantic Coast Communications has installed several miles of optical fiber at the Grounds for Sculpture to support an array of Technology enhancements at the museum. Atlantic Coast most recently provided design and installation support for the new Night Forms Exhibition. ACC worked with KLIP Collective, Thrasos Media a</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2829%29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Hamilton New Jersey
           &#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications has installed several miles of optical fiber at the Grounds for Sculpture to support an array of Technology enhancements at the museum. Atlantic Coast most recently provided design and installation support for the new Night Forms Exhibition. ACC worked with KLIP Collective, Thrasos Media and Oliver Communications Group to vision a new museum wide optical fiber ring that provided new optical connectivity and power availability to the heart of the museum park.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The project includes over 2 miles of directional bore conduits from a centralized headend location in the Motor Exhibit Building to 6 internal substation locations in the internal campus exhibit area. In tandem with the direction bores, over 2 miles of 48 strand single mode optical cable was installed to support the extended technology into the park. Each substation provided signal paths to either a theater production pole mounted projector display (13 of these total) or a mini station (18 of these total) which extends light and sound systems to support the video image being displayed at each unique art display on the campus.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The Night Forms project will officially kickoff its inaugural show on November 19th, 2021.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2829%29.jpg" length="412553" type="image/jpeg" />
      <pubDate>Thu, 10 Jun 2021 04:46:07 GMT</pubDate>
      <guid>https://www.accnjinc.com/grounds-for-sculpture-sculture-gardens-museum</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2829%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2829%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>The Arthaus, A Dranoff Property, Broad and Spruce Streets, Philadelphia</title>
      <link>https://www.accnjinc.com/the-arthaus-a-dranoff-property-broad-and-spruce-streets-philadelphia</link>
      <description>Our installation teams performed all interior communication wiring within 108 luxury residential units at this 47 story Premier Central Philadelphia Residential Tower. Construction took place over the course of 2020 and 2021. Additionally, Atlantic Coast performed all back of house communication connectivity to support</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2825%29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Intech Construction - Completion – Spring 2022
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Our installation teams performed all interior communication wiring within 108 luxury residential units at this 47 story Premier Central Philadelphia Residential Tower. Construction took place over the course of 2020 and 2021. Additionally, Atlantic Coast performed all back of house communication connectivity to support data, voice, security and Audio-Visual communication connectivity requirements for the Amenities and building facilities and systems. All work is being completed in line with the owner’s schedule and under the direction of the Intech Construction Team. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2825%29.jpg" length="37971" type="image/jpeg" />
      <pubDate>Tue, 11 May 2021 04:34:11 GMT</pubDate>
      <guid>https://www.accnjinc.com/the-arthaus-a-dranoff-property-broad-and-spruce-streets-philadelphia</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2825%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2825%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Penn Medicine - New Pavilion University of Pennsylvania Health System, Philadelphia.</title>
      <link>https://www.accnjinc.com/penn-medicine-new-pavilion-university-of-pennsylvania-health-system-philadelphia</link>
      <description>Penn Medicine’s new Pavilion, one of the largest hospital projects being completed in the United States, for opening November 2021 after four and a half years of construction at the site.

The 17-story plus 5 subterranean levels x 650-foot-long new bronze-beacon in Philadelphia, at one and a half million square feet</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2826%29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Penn Medicine’s new Pavilion, one of the largest hospital projects being completed in the United States, for opening November 2021 after four and a half years of construction at the site.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The 17-story plus 5 subterranean levels x 650-foot-long new bronze-beacon in Philadelphia, at one and a half million square feet is a behemoth. The site includes 504 private patient rooms and 47 operating rooms. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast built over 50 communications rooms to support all connectivity for the massive network supporting voice, data, distributed interior cellular equipment, audio visual systems for medical learning, patient communication, information, and entertainment systems. The work included more than 4000 feet of ladder runway within the secure distribution rooms, (430) cabinets and 1-ton capacity equipment racks, along with all grounding and bonding of all distribution room related infrastructure components throughout the hospital.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast also furnished and installed a Corning Solution for all optical back bones along with a copper backbone cables. The cables facilitated the interconnection of the Telecommunication Distribution Rooms (TDRs) to two distinct Telecommunication Equipment Systems Rooms (TSERs), on the west end on the lower levels and on the east end at the upper levels. All TDRs accommodated the interconnection to other TDRs on each level to allow for diverse feeds to all rooms from two distinct and physically distant sources. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The installed backbone (over 10,000 strands of single mode optical fiber and 3200 pairs of category 3 copper) supports over 30,000 category 6A shielded station cables installed throughout the site as part of another contract that we did not perform. All fiber terminations, were performed utilizing Corning Splice On UPC and APC connectors. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast’s on-site teams also provided planning, site logistics and installation of (504) patient room entertainment and medical information systems to include 75” Displays, all supporting electronics and HDMI connectivity for these Display. The 75-inch screen and smart board will help patients engage in their care and will allow patients to save, show, and send information to family and care providers. The patients also have controls at their fingertips for lighting, shades, temperature, and more, so they can personalize the room to their comfort level.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Additionally, we installed over 140 Caregility enhance patient monitoring systems that allow remote visual and audio communication between the patient and their care team for monitoring higher risk patients. We were among the first contractors on the site to complete our base bid requirements allowing the data systems to be live over 6 months in advance of the hospitals opening. 
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2826%29.jpg" length="10834" type="image/jpeg" />
      <pubDate>Mon, 18 Jan 2021 04:39:39 GMT</pubDate>
      <guid>https://www.accnjinc.com/penn-medicine-new-pavilion-university-of-pennsylvania-health-system-philadelphia</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2826%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2826%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Motto By Hilton Philadelphia Rittenhouse Square</title>
      <link>https://www.accnjinc.com/motto-by-hilton-philadelphia-rittenhouse-square</link>
      <description>Motto by Hilton Philadelphia Rittenhouse Square is situated on 19th Street, between Ludlow and Ranstead Streets. Atlantic Coast Communications NJ INC installed Voice and data cables to the 252 guest rooms and approximately 110 back of house connection to the amenities levels of the eleven-story micro-hotel. Along with</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2831%29.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Motto by Hilton Philadelphia Rittenhouse Square is situated on 19th Street, between Ludlow and Ranstead Streets. Atlantic Coast Communications NJ INC installed Voice and data cables to the 252 guest rooms and approximately 110 back of house connection to the amenities levels of the eleven-story micro-hotel. Along with the voice and data cables ACC installed 85 camera connections and a sound system throughout the building. Our work was performed for the General Contractor for this site, Intech Construction.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2831%29.jpg" length="20122" type="image/jpeg" />
      <pubDate>Fri, 01 Jan 2021 04:52:51 GMT</pubDate>
      <guid>https://www.accnjinc.com/motto-by-hilton-philadelphia-rittenhouse-square</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2831%29.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/image1+%2831%29.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>FMC Tower</title>
      <link>https://www.accnjinc.com/fmc-tower</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/FMC+Tower-99b0a7d8.jpg" alt="fmc tower"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           New Construction 48 Story commercial and residential Tower Philadelphia Completion December 2016
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           FMC Tower is a 49 Story Commercial and Residential office tower in Philadelphia PA. ACC performed this work as part of our contract with Turner Construction. Levels Sub Basement through 26 are for commercial Tenants. Levels 28 and up are an AKA property and feature short and long term furnished and unfurnished living space. ACC installed backbone to accommodate all data and limited analog voice connectivity to 46 IDF locations throughout the site. Additionally we installed all core and shell communications connectivity and interior apartment station wiring for all voice, CATV and data requirements. The building’s façade lighting is Ethernet controlled and is an iconic skyline spectacle. Additionally, ACC installed a Public Radio Repeater system to support public safety radio transmission throughout the site. Work was completed on schedule and to the satisfaction of the GC and owner.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Fri, 16 Dec 2016 09:33:14 GMT</pubDate>
      <guid>https://www.accnjinc.com/fmc-tower</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>The Judge Group</title>
      <link>https://www.accnjinc.com/the-judge-group</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/The+Judge+Group.png" alt="the judge group"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Corporate Headquarters Relocation – King of Prussia, PA Completed October 2016
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications NJ, Inc provided a Category 6A cable solution to this technology and healthcare personnel provider for the corporate relocation to King of Prussia. Work consisted of copper and fiber backbone to three IDF locations and installation of over 1000 Category 6A cables. This work was performed direct for The Judge Group.
           &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Mon, 31 Oct 2016 09:26:58 GMT</pubDate>
      <guid>https://www.accnjinc.com/the-judge-group</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>Shire Pharmaceuticals</title>
      <link>https://www.accnjinc.com/shire-pharmaceuticals</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Shire.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Direct for Owner –Relocation of Southeastern PA offices -Completed October 2016
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications NJ, Inc. has been Shire’s communication vendor since 2005. We have provided numerous design and build installations for the Chesterbrook, PA offices. The most recent project relocated the operation to Exton, PA. Work at this site included new optical and copper backbone to 4 IDF locations .
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Installation of 1100 Category 6 cables and reuse of 500 existing cables.  We are in process of adding over 1000 sound masking units throughout this new office site for Shire. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           ACC provided all break down and reinstallation of over 550 desktop devices allowing all parties to arrive at the new office site ready to work on day 1. 
            &#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Sun, 23 Oct 2016 09:22:54 GMT</pubDate>
      <guid>https://www.accnjinc.com/shire-pharmaceuticals</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>Dalian - Rodin Square Residential</title>
      <link>https://www.accnjinc.com/dalian-rodin-square-residential</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Rodin+Square.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            New Construction Philadelphia – Completed October 2016 –Dalian - Rodin Place is a residential apartment building with ground level retail recently completed in the Art Museum District in Philadelphia. The site has 293 apartments with amenities. ACC completed the installation of all voice, data and CATV within each apartment, feed cable to accommodate all back of house communications and all back of house base building wire for CATV, Voice and data connectivity. ACC was contracted to perform this work by the General Contractor, Intech. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Mon, 10 Oct 2016 09:19:36 GMT</pubDate>
      <guid>https://www.accnjinc.com/dalian-rodin-square-residential</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>University of Pennsylvania Museum – COXE Wing Upgrades</title>
      <link>https://www.accnjinc.com/university-of-pennsylvania-museum-coxe-wing-upgrades</link>
      <description>Atlantic Coast Communications provided data cabling in the Ancient Egyptian area of the COXE wing to support traditional data input locations including wireless signal paths, CCTV camera paths, and show lighting throughout the space. ACC also provided custom color raceway systems, backboxes and lighting track systems a</description>
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%286%29.png"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Completed Fall of 2025 - University City, Philadelphia
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications provided data cabling in the Ancient Egyptian area of the COXE wing to support traditional data input locations including wireless signal paths, CCTV camera paths, and show lighting throughout the space. ACC also provided custom color raceway systems, backboxes and lighting track systems and coordinated field raceway systems with electrical, mechanical, security, and data owners within the space. The museum space is supported by 5 diverse IDF locations throughout the site for which ACC provided new fit-outs and new optical and multipair risers which were routed to each new IDF from the primary base building MDF location.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%286%29.png" length="806517" type="image/png" />
      <pubDate>Thu, 30 Jun 2016 03:57:45 GMT</pubDate>
      <guid>https://www.accnjinc.com/university-of-pennsylvania-museum-coxe-wing-upgrades</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%286%29.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Picture1%286%29.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>University of Pennsylvania New College House Dormitory</title>
      <link>https://www.accnjinc.com/university-of-pennsylvania-new-college-house-dormitory</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/University+of+penssylvania.jpg" alt="University of penssylvania"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Completion June 2016
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           New College House, is a dormitory and was constructed on what used to be Hill Field occupying the block between 33
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           rd
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            and 34
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;sup&gt;&#xD;
      
           th
          &#xD;
    &lt;/sup&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Streets on the south side of Chestnut Street in Philadelphia. Work was performed direct for the University, the General Contractor was Intech.    ACC relocated approximately 1000 optical fiber strands to relocated duct banks in preparation for the site work to commence for the project. Subsequently, ACC was the awarded the network and communication construction for the project. The work included a build out of an MDF and 10 IDFS. New redundant OSP building feeds were installed to accommodate optical, multi-pair copper and hard line coaxial feed requirements (Data, limited analog voice and balanced CATV distribution respectively).  These backbone compliments were duplicated from the MDF out to 10 IDF locations, build-out of all consolidation  locations and category 6 station wire to over 1000 points and over 600 coaxial cables feeding all MATV requirements.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           ACC also installed a Public Safety Radio Amplification System throughout the facility to enhance radio communications for the University and City of Philadelphia Networks in partnership with RF Design and Integration of Bensalem, PA.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Sat, 04 Jun 2016 09:16:39 GMT</pubDate>
      <guid>https://www.accnjinc.com/university-of-pennsylvania-new-college-house-dormitory</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>Corning Incorporated Pharmaceutical Glass Manufacturing Facility</title>
      <link>https://www.accnjinc.com/corning-incorporated-pharmaceutical-glass-manufacturing-facility</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Corning.jpg"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Vineland, NJ – 24/7-365 Pharmaceutical glass manufacturing facility –ACC installed redundant aerial, underground and inside plant optical backbones connecting 9 buildings at this South Jersey location. ACC performed this work direct for Corning as part of our Shared Services Agreement.– Completed Summer 2016
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Wed, 01 Jun 2016 09:41:42 GMT</pubDate>
      <guid>https://www.accnjinc.com/corning-incorporated-pharmaceutical-glass-manufacturing-facility</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>Temple University – Science Education and Research Center</title>
      <link>https://www.accnjinc.com/temple-university-science-education-and-research-center</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Temple+University.jpg" alt="Temple University"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Philadelphia - Labs and Classrooms Completed January 2015
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Atlantic Coast Communications performed installation of backbone distribution (Data, Voice and CATV)  to 8 IDF locations and category 6 station wiring serving over 2500 station users in this new laboratory at Temple University.  Work for the project was performed for the Gordon Group who handled the electrical construction and fit-out. ACC has been a vendor of choice at Temple since 2000. We have been involved with minor and major retrofits and construction projects for the University and Health system including Morgan Hall Dormitory and Dining facility. We continue to support University IT infrastructure needs on a daily basis as demand requires. 
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Fri, 16 Jan 2015 09:32:39 GMT</pubDate>
      <guid>https://www.accnjinc.com/temple-university-science-education-and-research-center</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>Barnes Foundation – Art Education Institute</title>
      <link>https://www.accnjinc.com/barnes-foundation-art-education-institute</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Barnes+Foundation.jpg" alt="Barnes Foundation – Art Education Institute"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Art Education Institute houses largest collection of impressionist and post impressionist art in the world –Philadelphia Completed May 2012
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           ACC installed infrastructure for the world renowned Barnes Foundation new home designed by Tod Williams Billie Tsien Architects as contracted by LF Driscoll. The work included build out of an MDF and 4 IDF locations and Category 6 station wire throughout serving the galleries, administrative and classroom sections, wireless and wired networks and an extensive IPTV security system.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Fri, 11 May 2012 09:38:59 GMT</pubDate>
      <guid>https://www.accnjinc.com/barnes-foundation-art-education-institute</guid>
      <g-custom:tags type="string" />
    </item>
    <item>
      <title>Lincoln Financial Field</title>
      <link>https://www.accnjinc.com/lincoln-financial-field</link>
      <description />
      <content:encoded>&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/99893b2d/dms3rep/multi/Licon+FInancial+Field.jpg" alt="Lincoln Field"/&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Panasonic Everest Network Installation at Lincoln Financial Field, Home of the Philadelphia Eagles
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Atlantic Coast Communications provided installation materials and labor to integrate Panasonic’s Everest™ Ultra-High Density Wi-Fi system at the 1.7msf Lincoln Financial Field. ACC’s Scope of Work included demolition of existing infrastructure, and installation of 653 Everest access points and the associated 1306 Category 6 data drops, conduit, and secondary steel required to complete the project. The work was performed over a four month period, and was completed in July of 2017. ACC performed directly for Panasonic Enterprise Solutions Company.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Compared to traditional Wi-Fi solutions, Panasonic’s Everest solution offers significantly greater performance compared to legacy systems. The Everest system is the first Wi-Fi solution engineered from the ground up to overcome the challenges of serving tens of thousands of fans simultaneously in ultra-high-density sports and entertainment environments. The installation has set records for data transfer at Lincoln Financial Field.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           The work included installation of painted rigid conduit to conceal cabling in seating bowl areas. Installation and strategic aiming of all Everest Antennas were performed by ACC staff under guidance provided by Everest engineers. ACC partnered with Superior Scaffolding for all stationary and swing scaffolding required to reach the areas inaccessible from traditional man lift equipment. The work was completed on schedule and within budget, resulting in both Panasonic and the Philadelphia Eagles becoming satisfied customers.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <pubDate>Mon, 30 Apr 2012 09:13:42 GMT</pubDate>
      <guid>https://www.accnjinc.com/lincoln-financial-field</guid>
      <g-custom:tags type="string" />
    </item>
  </channel>
</rss>
